The Mondrian Hotel remodel was a team effort with Philippe Starck for Ian Schrager Hotels of New York. As the executive architect for the remodel of the 16,000 sq. ft. ground floor public spaces: our work included lobby, lounge, restaurant, gym, terrace, new pool, and outdoor bar.

The compressed twelve-month schedule began with extensive review of existing building conditions and original documentation to trouble shoot structural, mechanical, and electrical requirements of the new design. After a design, documentation and approval period of six months, construction of the $2.8 million remodel was completed in six months around the operational hotel to meet the original scheduled opening date.

STATUS
COMPLETED 1996

LOCATION
WEST HOLLYWOOD, CA

CLIENT
IAN SCHRAGER HOTELS

PROGRAM
16,000 SF OF PUBLIC SPACE